2007年8月8日星期三

Turbine placement

As a general rule, wind generators are practical where the average wind speed is 10 mph (16 km/h or 4.5 m/s) or greater. Usually sites are pre-selected on basis of a wind atlas, and validated with wind measurements. Obviously, meteorology plays an important part in determining possible locations for wind parks, though it has great accuracy limitations. Meteorological wind data is not usually sufficient for accurate siting of a large wind power project. Site Specific Meteorological Data is crucial to determining site potential. An 'ideal' location would have a near constant flow of non-turbulent wind throughout the year and would not suffer too many sudden powerful bursts of wind. An important turbine siting factor is access to local demand or transmission capacity.

The most crucial step in the development of a potential wind site is the collection of accurate and verifiable wind speed and direction data as well as other site parameters. To collect wind data a Meteorological Tower is installed at the potential site with instrumentation installed at various heights along the tower. All towers include anemometers to determine the wind speed and wind vanes to determine the direction. The towers generally vary in height from 30 to 60 meters. Some meteorological towers are much taller and more permanent like the Obninsk Meteorological Tower in Russia at 315 meters. The towers primarily used in determining site feasibility for potential wind farms are guyed steel-pipe structures which are left to collect data for one to two years and then usually disassembled. Data is collected by a data logging device which stores and transmits data to a server where it is analyzed

没有评论: